- Houston TX, US Jose Melguizo - Katy TX, US Pheng Aun Soh - Houston TX, US Craig Cotton - Cypress TX, US
International Classification:
E21B 33/03 E21B 15/00 E21B 19/02
Abstract:
A technique enables maintenance of sufficient clearance between a wellhead and, for example, a mobile rig. The technique facilitates support of a cable, e.g. an antenna suspension cable, at the wellhead without detrimentally affecting the desired clearance. According to an embodiment, a flange system is used in combination with a cable clamp assembly at a wellhead. The flange system may comprise a flange having a connector portion configured for coupling with the wellhead. The flange also comprises a cylinder portion coupled to the connector portion such that the cylinder portion extends into a corresponding bore of the wellhead. The cable clamp assembly is configured to clamp around and support a cable extending down through the wellhead. The cable clamp assembly is supported within the cylinder portion of the flange such that the cable clamp assembly is at least partially disposed within the wellhead.
Cameron - Houston, Texas Area since May 2011
HPHT Project Engineer
Electronic Power Design Jan 2010 - Apr 2011
Mechanical Engineer
EDG - Houston, Texas Area May 2008 - Aug 2008
Facilities Engineer Intern
Education:
Texas A&M University 2006 - 2009
Mechanical Engineer, Engineering
Skills:
Engineering Project Engineering Mechanical Engineering Oil and Gas P&Id Petroleum Mathcad Feed Piping Energy Engineering Design Inventor Subsea Engineering Oil/Gas Gas Microsoft Office Autodesk Inventor Autocad Solidworks Materials Manufacturing Instrumentation Onshore Piping and Instrumentation Drawing Latinamerica Engineering Wellhead Equipment Mudline Equipment Value Engineering Oil
Jose Melguizo est en Facebook. nete a Facebook para conectarte con Jose Melguizo y otras personas que tal vez conozcas. Facebook permite compartir y ...