A precast under floor air delivery construction is provided which includes a plurality of precast concrete system having an upper base floor surface and a lower surface, a plurality of floor panel support means bearing directly to the upper base floor surface capable of an under floor air delivery between the floor panels and the upper surface, a plurality of access floor panels connected to the support means, and a fire protection barrier applied between the concrete slabs.
A raised floor access panel is provided which includes a substantially flat panel having an upper load supporting surface and a lower surface to be supported on a plurality of pedestal support members each adjacent to a corner of the panel, and at least one panel lifter having a top wall and two side walls, the side walls slidably extending through a first and second slots in a plate rigidly attached to the lower surface for vertical travel of the top wall and side walls upwardly, through a generally rectangular panel recess.
Precast Prestress Raised Access Floor Construction
Gary Meyer - Golden CO, US Charlie Johnson - Wheat Ridge CO, US Jim Blackledge - Denver CO, US Dan Parker - Arvada CO, US John Hanlon - Littleton CO, US
International Classification:
E04C 5/08 E04B 1/00
US Classification:
522236, 52250, 52263, 5250606, 5274513
Abstract:
A precast prestress raised access floor construction is provided which includes a precast prestress concrete slab, having an upper base floor surface and a lower surface, a plurality of raised access floor panel pedestal support members bearing directly upon the upper base floor surface, and a plurality of raised access floor panels connected to the support means whereby a void is formed between the floor panels and the upper base floor surface.
A method for installation of a raised access floor panel with a raised access floor is provides which includes providing a pedestal support system having a plurality of vertically extending pedestal supports each having an upper end connected to a pedestal support head and a lower end connected to a pedestal support base. The pedestal support heads are each connected in a matrix orientation with a plurality of horizontal stringers. A floor panel plate is provided having four corner portions, four lateral edge portions, an upper load bearing surface, a lower plenum surface, and a clear hole positioned adjacent to each of the corner portions. A threaded collar is vertically connected to the lower plenum surface and positioned in axial alignment with the clear hole. A single handed set screw has an upper tool receiving end and a lower foot end. The set screw engages the threaded collar so that the tool receiving end extends through the clear hole.
A floor panel plate has four corner portions, four lateral edge portions, an upper load bearing surface, a lower plenum surface, and a clear hole positioned adjacent to each of the corner portions. A threaded collar is vertically connected to the lower plenum surface and positioned in axial alignment with the clear hole. A single handed set screw has an upper tool receiving end and a lower foot end. The set screw engages the threaded collar so that the tool receiving end extends through the clear hole so that when operated the set screw adjusts the upper load bearing surface to a predetermined level in relation to the pedestal head of a pedestal support system.
A raised access floor panel with a replaceable insert is provided. The panel includes a cross-braced framework constructed of four side rail members, and at least one cross-brace member. The cross-brace member is connected to the rail members so that the cross-brace member spans an area defined by the rail members. A plate frame is connected to an upper edge of the framework. The plate frame has a centroid void area which is surrounded by a peripheral portion. The peripheral portion includes an inner margin and an outer margin. The outer margin has right-angled corner forming portions. The inner margin is formed with a Z-section profile having a web portion which is capable of receiving the panel insert in fitment with the plate frame so that the insert and the peripheral portion are capable of providing a co-planar working surface.
A directional flow raised floor air-grate is provided for the enhanced thermal management of a raised floor computer room. The air-grate includes a load bearing frame. The frame has four vertical girders connected, in a ninety-degree alignment, so that four corners of the frame are capable of supporting the air-grate as an air handling separation barrier on a raised floor pedestal support system. A plurality of vertical reinforcing beam members is connected to the frame so that the reinforcing beams are aligned in a longitudinal spaced relationship. At least two vertical airfoil vane members have an upper inclined and, lower vertical planar surfaces. These surfaces are demarcated by a longitudinal axis of the vane members. The vane members are connected to the frame in a crosswise spaced relationship to the reinforcing beam members, so that a plurality of openings are created between the reinforcing beams and the airfoil vanes. The upper inclined planar surface of the airfoil directs cooling air from a lower plenum of a raised floor through the openings on an inclined plane towards the cold air intake surfaces of a data server cabinet to be cooled.
Honestly, that's far more churlish than Telluride's co-directing triumvirate Tom Luddy, Gary Meyer and Julie Huntsinger would ever be in addressing the fact that earlier this year, the utterly vital and massive Toronto International Film Festival (Sept. 4-14) laid down the law.
"I'm deeply touched that the board of the Telluride Film Festival decided to honor Roger this way and I send my sincere thanks and congratulations on their 40-year anniversary to festival directors Tom Luddy, Gary Meyer, and Julie Huntsinger," Eberts wife, Chaz, said in a statement.
"The festival's founders [Bill and Stella Pence] are in their 70s, and we wanted to celebrate this incredible thing they built and we're carrying on, in a really big way," says executive director Julie Huntsinger, whose fellow fellow directors are Gary Meyer and Tom Luddy(also a festival cofounder
Date: Aug 28, 2013
Category: Entertainment
Source: Google
Telluride festival: 'Argo,' 'The Gatekeepers' start Oscars talk
festival feels conflicted about, as Telluride officials would rather their lineup be more focused on surprises than trophies. "I worry about the time when we don't have 25 Oscar nominations for films playing at the festival," said Gary Meyer, who with Tom Luddy and Julie Huntsinger directs the festival.
Date: Sep 03, 2012
Category: Entertainment
Source: Google
Telluride film lineup: 'Descendants,' 'Albert Nobbs,' 'Shame'
Finland, Hungary, Poland, Belgium and Albania. Eclecticism, in other words, trumps populism.The commercial stuff does not jump out at you, said Julie Huntsinger, who with Tom Luddy and Gary Meyer directs the festival. But we think its a great bouquet.In its determination to program its Labor D
Date: Sep 01, 2011
Category: Entertainment
Source: Google
Googleplus
Gary Meyer
Lived:
Westminster, CO Larned, KS Castle Rock, CO Sabetha, KS Salina, KS Macksville, KS Wichita, KS
Work:
Wal-Mart - Computer Programmer, Work on Computers, Sell cell phones TeqXperts, LLC Movie Gallery J.C. Flicks Process Analysts, Inc. Mac Equipment, Inc. Hartford, Inc.
Education:
Regis University, Kansas State of Salina, Kansas College of Technology